Distrigas, Boston,
Boston, U.S.A.
Man Hours: 97,000
Fabricom Contracting Limited were contracted to carry out the detailed design, engineering, construction, testing and supervision of the installation of 4 LNG High Pressure Pumping Modules weighing 320T.
Demanding project time scales required the modules to be completed and delivered within 20 weeks. Fabricom’s expertise in the construction of modular process plant packages proved an important factor to both process engineer and the operator, in order to ensure that schedule, technical and commercial targets were satisfied. The project also involved the manufacture of 4 stainless steel cryogenic pressure vessels, installation of 8 booster pumps, fabrication of stainless steel pipe work which was fully foam glass insulated in accordance with cryogenic specifications.