Fabricom Piping
Kirklees
Man Hours: 29,000
Fabricom Contracting were responsible for the fabrication and installation of the steam and water cycle system within the plant.
This involved the installation of vessels, tanks, preheaters, PAU’s, pumps and auxiliary air coolers. In addition several of the vessels were also fabricated by Fabricom Contracting Limited.
Due to major restrictions on access, egress and laydown areas, the project required meticulous planning and execution. Detailed communications between Head Office and the site based team ensured that equipment was offloaded and erected directly onto the specific job location. The project was successfully carried out by implementing the Fabricom Group FPCS computer software.